Due to the holiday season, our opening hours may be limited between 3rd and 12th July. Please email or call ahead before visiting to ensure someone is available at the warehouse.

CORDIAL CFY3 WPP LONG LEAD 3M 3.5MM TRS TO DUAL 6.35MM TS - LONG SPLIT - Soundtown

CORDIAL CFY3 WPP LONG LEAD 3M 3.5MM TRS TO DUAL 6.35MM TS - LONG SPLIT

Regular price
$40.00
Sale price
$40.00
Regular price
Contact us
Unit price
per 
GST Included. Shipping calculated at checkout.

This Y-splitter is used to connect a mobile phone or laptop to active speakers when they are further apart. The stereo signal is split into two mono channels so that they can be mixed separately. Both channels are colour-coded.

The high-quality metal REAN® by NEUTRIK® connectors can be unscrewed and are protected against damage by a kink protection. The contacts are gold-plated to prevent corrosion.

The conductor area of 0.22 mm² and a braided shield of bare copper wires ensure loss-free transmission. The length of the cable before splitting is approx. 15 cm and it is protected from damage by a strain-relieving fixation.

Length: 3m

Contact Us about this product: